Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System
Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System

What are the sub-tube structures need to pay attention to?

Released on Nov. 23, 2019

Build shelf tube looks simple,I think it is the door is not simple technology live, the slightest mistake there will be security risks, and thus cause major security incidents, so in order to prevent this situation, xiaobian today for everyone to share a simple shelf tube to build the application must pay attention to the problem:


 1, the project outside the shelf tube application time will be longer, so the application of the whole process must also carry out inspection, found that the basic down, component deformation is more serious, security is not complete, pull loose and other problems to deal with immediately.


 2, on the shelf tube working staff can not just move the shelf tube pull all contacts and shelf tube, and scaffolding fasteners strapping buckle all iron frame member.When the work must be sure to disassemble some of the members or even the wall pieces, should get the project responsible for construction and professional and technical personnel willing to fill the structure and use reliable reinforcement countermeasures.


 3, iron shelves working staff as found shelf safety protection is not perfect, the work is not convenient to immediately to the construction responsible person or decoration Foreman reflected by the aircrew immediately set up or improved to release work.

30.jpg

4, work should pay attention to remove the surface of the raw material fell into the frame anytime, anywhere, keep the frame surface clean-up, do not huddle raw materials, special tools, to prevent the safety of their own work and produce something to death.


 5, every time to work, should put the frame surface of the raw materials used up or stacked neat, to prevent the generation of lost material to death.


 6, is strictly prohibited in the frame surface play tease, regressive walk and sit across the outer fence rest, to prevent human misalignment fall safety accidents.


 7, the shelf tube to carry out electrical welding work, to shop tin or remove flammable items, and do a good job in advance to prepare fire safety, to prevent fire accidents.


 8, rain, snow after the release of work, should put the snow on the surface of the frame, the water removed, to prevent slippage.


 9, when the frame surface aspect ratio is insufficient, must be wooden, must adopt the method of stable and reliable wooden frame, and the wooden frame does not have to exceed 0.5 m, beyond 0.5 M, should be set up according to the requirements of rising iron shelves plated layer.When pulling the face, to a relatively wide safety protection equipment.


 10, on the shelf tube working staff should walk up and down the ladder, prohibiting climbing iron shelves.


 The above is the flame Xin Sen domain xiaobian for you to introduce some of the contents of the correct way to build shelves, if you have a need, please leave a message online customer service, we will do our best to serve you!


amy
ivan
sharon