Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System
Structural Steel
Scaffold Steel Plank
Scaffolding Accessories
Scaffolding System

Scaffolding steel pipe removal process(一)

Released on Feb. 23, 2018

1, scaffolding steel pipe removal process:

Safety net → disassembly fence → disassemble the hand → disassemble the crossbar → disassemble the rod → disassemble the force support → disassemble the rod → pull the rod to the ground → eradicate the fastener → stacking according to specifications;

2, before the removal of scaffolding site technicians and full-time security officers need to conduct safety personnel on the job, before the removal operation;

3, the demolition of the rod and put the rod when necessary from 2 to 3 people in collaboration with the demolition of the big bar, the person who will be standing in the center of the rod will be passed down the next to receive the rod to take the bottom of the prison, the top staff Only let loose, do not throw litter fixtures;

4, the removal of multi-layher scaffolding should be along the pier body around from top to bottom, can not work together or one by one, followed by removal;

layher scaffolding


amy
ivan
sharon